Measure logo

Migration Guide for `v0.9.x`

Migration guide for self-hosted Measure v0.9.x. Configuration migration and database synchronization.

Use this guide only when you are on less than v0.9.0 and upgrading to v0.9.x.

Steps mentioned in this document will cause downtime.

Follow these steps when upgrading to 0.9.x. There is some downtime involved. During the downtime SDKs would receive a 503 Service Unavailable when sending sessions. Once the upgrade is complete, ingestion should resume normally. SDKs will retry sending unsent sessions automatically.

1. SSH into the VM where Measure is hosted

2. Shutdown all Measure services

cd ~/measure/self-host
sudo docker compose -f compose.yml -f compose.prod.yml --profile init --profile migrate down --remove-orphans

3. Perform the upgrade

Visit Releases page to capture the latest tag matching the [MAJOR].[MINOR].[PATCH] format.

cd ~/measure
git reset --hard # only applies if you have local modifications
git fetch --tags
git checkout <git-tag>

4. Migrate configurations

cd self-host
sudo ./config.sh --production --ensure

5. Run database synchronization & migration scripts

Perform this step to complete the migration. Measure dashboard may not work properly until this step is completed.

sudo ./migrations/v0.9.x-sync-databases.sh

6. Start Measure services

sudo ./install.sh

Think this page can be better?

Open an issue